wooly Posted September 26 Share Posted September 26 Needs: I have two devices [mostly resistive] loads connected to two outputs, each one could draw between a fraction of W up to 2.2 kW . but the line that connect them cannot accept more than 14 A for periods over 30 sec. I need that the controlling device [Pro4PM or 2plusPM] shut down the second output when the combined load of all outputs exceed 15A for more than 9 seconds, then wait until the load on the other outputs go under 4A , then reactivate secondoutput, and restart the 30 second poll I was thinking that power would have been handled in a similar way as temperature and humidity on uni, but on the web interface of the 2+PM these is nothing (I have not on hand a PRO4PM) , other then "protection", that hovewer works on a single load, not on the sum. There is some ready script to accomplish this need ? Quote Translate Revert translation? English (American) Finnish French German Italian Portuguese (European) Spanish Link to comment Share on other sites More sharing options...
Fideri Posted yesterday at 12:35 Share Posted yesterday at 12:35 I guess you have to write your own script, using something in the example library as a base. It is also available on github. Have you seen this video: Quote Translate Revert translation? English (American) Finnish French German Italian Portuguese (European) Spanish Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.